Emerald Place Condominiums

Edmonds, Washington

Emerald Place Condominiums

Aware that the three-story residential building was occupied during all stages of work, our team placed special emphasis on keeping disruptions to the residents to a minimum. Doubling as a dust enclosure, a tented scaffolding system to provide weather protection was used to repair the exterior wall. We assisted homeowners with the removal, storage and protection of personal belongings within units and exterior decks. In addition to the structural and roof work, we carried out the removal and replacement of stucco cladding, water resistant boards and fiber-cement siding. We removed and replaced vinyl windows and window trim. The existing deck membrane was waterproofed with a new coat of deck membrane. To intercept the flow of water and prevent it from entering the building, we installed metal copings and membrane flashings. The project came to a successful completion with the removal and replacement of concrete topping slabs on patios.

Owner
Emerald Place Condominiums HOA
Architect
JRP Engineering, Inc.
Emerald Place Condominiums
Emerald Place Condominiums