Phase 1 of the LogistiCenter℠ at Hwy 92 project included the demolition of former Berkeley Farm facility, Phase 2 included the construction of both new buildings 1 and 2 situated on 20.54 acres. Building 1 features 119,000 sf, 36-ft clear height, 38 dock doors and 2 grade level doors. Building 2 features 231,147 sf, 32-ft clear height, 23 dock doors and 2 grade level doors. Offsite development along Clawiter was also completed.