The scope of work for Sugar Pine Village Phase 1 included hardware installation, piping and water systems, tiling and carpeting, electrical work, paving improvements, and more. Construction for Phase 1 of this project began in May 2023 and is comprised of two three-story buildings and one three-story building, 68 units, 116 parking spaces, and 80,341 sf of construction. The project is designed to provide residents with new high-quality, sustainable housing to support active transportation, encourage biking, walking, transit accessibility, and connection with nearby trails for the local workforce and their families.
Sugar Pine Village is a modular construction project that involves individual units being constructed off-site in quality-controlled environments and carefully transferred to the job site with care. Modular construction allows for tighter schedules, minimized waste, lessened exposure to the elements, and more—resulting in lower costs and expedited occupancy availability. The numbered units were stored at Heavenly Valley before being transported to the project site.